Construction of a new 2 storey independent lining unit facility in Northcote. Works comprised the construction of a bored pier and blockwork retaining wall system to allow for the trimming / excavation of the existing embankment to provide a 3000m2 building bench to accommodate the new facility. The new building (approx. 2600m2 over 2 levels) it was built in a horse shoe configuration allowing the existing facility to connect to the proposed. Each of the 22 independent livings units comprised 1 x bedroom, living area, walk in robe, ensuite, kitchen and external terrace/ balcony area. Communal lounge and social areas area provide on each level together with a central lift to service the building.