Projects

48 Assembly Drive

Written by 2Construct | Oct 2, 2025 11:46:47 PM

Aliro Group are expanding the industrial development at 48 Assembly Drive through a series of staged construction to facilitate live operations of existing tenant and creation of a new tenancy.

The design and construction scope encompasses the delivery of two new tenancies within an existing 50,000 sqm warehouse. This includes the development of new mezzanine office and dock office spaces, as well as recessed dock bays. The works cover all construction activities associated with the establishment of General Motors Holden’s (GMH) new tenancy and the allocation of floor area for a future lettable space. Additionally, the project incorporated the provision of essential services to support future estate development, specifically those required in proximity to the Warehouse 1 works.

The proposed works of 48 Assembly Drive were formalised with 2Construct and Aliro under an ECI arrangement and cost planning, that led to a lump sum D&C offer. Under an Early Contractor Involvement (ECI) arrangement, 2Construct led design development of the existing facility from concept through to issuance of the initial Building Permit. This included coordinating power and authority requirements in collaboration with the developer. A series of enabling works were undertaken to facilitate the relocation of the existing site-wide IT infrastructure to its permanent location, as well as the temporary relocation of General Motors Holden (GMH) warehouse and office personnel through demolition phase.