Aliro Group are expanding the industrial development at 48 Assembly Drive through a series of staged construction to facilitate live operations of existing tenant and creation of a new tenancy.

The design and construction scope encompasses the delivery of two new tenancies within an existing 50,000 sqm warehouse. This includes the development of new mezzanine office and dock office spaces, as well as recessed dock bays. The works cover all construction activities associated with the establishment of General Motors Holden’s (GMH) new tenancy and the allocation of floor area for a future lettable space. Additionally, the project incorporated the provision of essential services to support future estate development, specifically those required in proximity to the Warehouse 1 works.

The proposed works of 48 Assembly Drive were formalised with 2Construct and Aliro under an ECI arrangement and cost planning, that led to a lump sum D&C offer. Under an Early Contractor Involvement (ECI) arrangement, 2Construct led design development of the existing facility from concept through to issuance of the initial Building Permit. This included coordinating power and authority requirements in collaboration with the developer. A series of enabling works were undertaken to facilitate the relocation of the existing site-wide IT infrastructure to its permanent location, as well as the temporary relocation of General Motors Holden (GMH) warehouse and office personnel through demolition phase. 

 

CLIENT

Aliro Group

ADDRESS

48 Aseembly Drive, Dandenong VIC

ARCHITECT

JMA Architects

COMPLETION

TBC

Huntingtower Junior and Senior School

The project includes the removal of existing structures and hazardous materials, early refurbishment of administration, junior, and LOTE buildings, and the...

Civic/Landscape Education Building Construction

Daral Ulum College of Victoria - Stage 2A&2B

The scope of work comprises construction of a three -storey Middle School building (Stage 2A&2B) including 15 Classrooms, Open-space learning/self-study area,...

Civic/Landscape Education Building Construction

St Bernard's College - The Quays

The scope of work comprises refurbishment to the ground floor of the Tobin building to create a new commercial kitchen, canteen, dining area, and study space,...

Civic/Landscape Education Building Construction

Camberwell Girls Grammar School - Barbara Sutton Hall Refurbishment

Barbara Sutton Hall has been a central part of Camberwell Girls Grammar School for over 35 years. Now, we are transforming this space to better meet the needs...

Civic/Landscape Education Building Construction