Construction of the new Secondary College in Doreen South, was an addition to an existing educational precinct. Stage 1 included three new buildings to accommodate; a single level food technology and administration facility, new learning and teaching spaces over two levels, and a further two-level structure to provide staff lounge, kitchen, and infrastructure facilities. External basketball courts, car parking and landscaping was included. Stage 2 saw the introduction of a new Performing Arts & Hospitality building, STEAM building, and a gym/fitness centre, all linked by pathways, active and passive outdoor spaces, and included a new sports oval and additional car parking.
Photography credit: Rhiannon Slatter Photographer