The redevelopment of the Vic Dock precinct included site strip and demolition, earthworks consisting of cut, fill, trimming and compacting. The hydraulics installation included trenching and backfill. Electrical services installation included new light poles and trenching. Drainage installation, included grated trench installation, trenching and backfilling. Installation of heavy pavements consisting of the cement treated crushed rock installation, cement slurry application, and asphalt and prime installation.